Please ensure Javascript is enabled for purposes of website accessibility Jump to content

HX Edit - can no longer drag and drop presets to change order


prskier17
 Share

Recommended Posts

I frequently reorder my presets to match setlist order.  Until recently this was a simple task in HX Edit.  Today it no longer works.  Rather that let me reorder, HX Edit asks if I want to overwrite the preset that I'm attempting to drag a different one above or below.  I'm using a Helix Floor and can still reorder on the Helix's physical screen.  Both the Helix Floor and HX Edit are up-to-date.  Anyone else have this issue and did you find a solution?  

 

Thanks!

Chris

Link to comment
Share on other sites

On 2/16/2025 at 1:55 AM, prskier17 said:

Today it no longer works.  Rather that let me reorder, HX Edit asks if I want to overwrite the preset that I'm attempting to drag a different one above or below.

 

Same comments as the others - It works for me and look for the blue line.

 

Also, you could try reinstalling HX Edit v.3.82 to see if that fixes the problem.

 

Hope this helps/makes sense.

Link to comment
Share on other sites

This just started happening to me yesterday.  I connected my older laptop and everything behaves as it should.  I uninstalled and reinstalled HX Edit 3.82 (Helix Floor is at 3.80) and the issue is still present on my newer laptop.  So this is an issue only occurring on my fairly new (~3 month old) Lenovo Legion 5 slim Windows 11 laptop.  Reordering worked fine on this newer laptop until yesterday.  I don't think I changed anything, but I guess it's possible I did...

Link to comment
Share on other sites

On 2/16/2025 at 9:09 PM, prskier17 said:

This just started happening to me yesterday.  I connected my older laptop and everything behaves as it should.  I uninstalled and reinstalled HX Edit 3.82 (Helix Floor is at 3.80) and the issue is still present on my newer laptop.  So this is an issue only occurring on my fairly new (~3 month old) Lenovo Legion 5 slim Windows 11 laptop.  Reordering worked fine on this newer laptop until yesterday.  I don't think I changed anything, but I guess it's possible I did...


Hmm.. new computer running Windows 11?
 

Could this be something related to the memory integrity and the driver?

 

I’m a Mac user, so I maybe misremembering something that first cropped up a couple of years back, where Windows 11 users found that switching off Core Isolation Memory Integrity feature fixed some issues.

 

Hope this helps/makes sense.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...